RTA Cabinet Installation Process: What Tampa Bay Homeowners Should Expect

After 18 years of managing RTA cabinet installations across Tampa Bay, I've overseen thousands of successful projects. Understanding the installation process helps homeowners prepare properly and ensures a smooth, stress-free experience. Here's exactly what to expect during your RTA cabinet installation.

Professional cabinet installation in progress

Installation Manager's Note

"A successful installation starts with proper preparation. The more prepared you are, the smoother the process will be. We've refined our process over thousands of installations to minimize disruption while ensuring perfect results." - David Thompson

Step-by-Step Installation Process

1

Pre-Installation Preparation

1-2 hours

Site preparation and final measurements verification

What We Do:

  • Verify all measurements and cabinet specifications
  • Check electrical and plumbing rough-ins
  • Protect surrounding areas with drop cloths
  • Organize tools and materials for efficient workflow
2

Remove Existing Cabinets

2-4 hours

Careful removal of old cabinets and cleanup

What We Do:

  • Disconnect plumbing and electrical connections
  • Remove countertops and backsplash if necessary
  • Carefully remove cabinets to avoid wall damage
  • Clean and prepare wall surfaces
3

Wall Preparation

1-3 hours

Ensure walls are level, plumb, and ready for installation

What We Do:

  • Check wall studs and mark locations
  • Level and plumb all wall surfaces
  • Make any necessary electrical or plumbing adjustments
  • Prime and touch up wall paint if needed
4

Upper Cabinet Installation

3-5 hours

Install upper cabinets first for easier access

What We Do:

  • Mark cabinet locations on walls
  • Install temporary support ledger boards
  • Mount upper cabinets and secure to wall studs
  • Align and level all upper cabinet units
5

Lower Cabinet Installation

4-6 hours

Install base cabinets and ensure proper alignment

What We Do:

  • Position and level base cabinets
  • Secure cabinets to walls and each other
  • Install cabinet fillers and trim pieces
  • Verify all doors and drawers operate smoothly
6

Hardware and Final Details

2-3 hours

Install hardware and complete finishing touches

What We Do:

  • Install all cabinet doors and drawer fronts
  • Mount handles, knobs, and other hardware
  • Adjust hinges and drawer slides for perfect operation
  • Install crown molding and trim pieces
7

Quality Inspection and Cleanup

1-2 hours

Final inspection and complete site cleanup

What We Do:

  • Test all doors, drawers, and hardware
  • Make final adjustments for perfect alignment
  • Clean all cabinet surfaces and hardware
  • Remove all debris and protective materials

Installation Timeline

Typical Project Timelines

1 Day

Small Projects

  • • Single bathroom vanity
  • • Small powder room
  • • Laundry room cabinets
  • • Single wall kitchen
2-3 Days

Standard Projects

  • • Full kitchen renovation
  • • Master bathroom suite
  • • Multiple room projects
  • • Complex custom work
4+ Days

Large Projects

  • • Whole house cabinets
  • • Commercial installations
  • • Extensive custom built-ins
  • • Multi-phase projects

Homeowner Preparation Checklist

1-2 Weeks Before

Confirm installation date and timeline
Order and receive all cabinet components
Schedule any electrical or plumbing work
Arrange temporary kitchen setup if needed

1 Week Before

Clear out all existing cabinets completely
Remove items from installation area
Confirm access routes for delivery
Arrange pet and child care for installation days

Day Before

Final cleanup of installation area
Ensure clear access from entry to kitchen
Prepare temporary food storage and cooking area
Confirm installer arrival time

Installation Day

Be present for installer arrival
Provide access to utilities (water, electrical)
Keep pets and children away from work area
Be available for questions and decisions

Florida-Specific Installation Considerations

Humidity and Climate Control

Florida's humidity can affect cabinet installation. We take special precautions:

  • • Acclimate cabinets to home environment before installation
  • • Use moisture-resistant fasteners and adhesives
  • • Ensure proper ventilation during and after installation
  • • Allow extra time for adhesives to cure in humid conditions

Hurricane Preparedness

We install cabinets with Florida's weather in mind:

  • • Extra-secure mounting for upper cabinets
  • • Hurricane-rated fasteners in coastal areas
  • • Reinforced connections for heavy items
  • • Proper drainage considerations for outdoor cabinets

Quality Assurance and Warranty

Our Installation Guarantee

Quality Standards

  • • All doors and drawers properly aligned
  • • Smooth operation of all moving parts
  • • Secure mounting to building standards
  • • Clean, professional finish work

Warranty Coverage

  • • 2-year installation workmanship warranty
  • • Lifetime structural component warranty
  • • 10-year hardware warranty
  • • 30-day follow-up adjustment service

After Installation: What's Next?

Immediate Next Steps

  • • Final walkthrough and inspection with installer
  • • Receive care and maintenance instructions
  • • Schedule countertop installation if applicable
  • • Plan backsplash and finishing work

30-Day Follow-Up

  • • Complimentary adjustment visit
  • • Address any settling or minor issues
  • • Final hardware adjustments
  • • Answer any questions about operation